Maksons designed, manufactured & installed this these stacked balconies at Crescent Parade in Hillingdon.
Scope of works:
This project consisting of a galvanised stacked balcony structure, paired with a stainless steel glass balustrade.
Installation was completed within a week using a crane and MEWP.
It was a pleasure working on this residential new build with the Architects, Structural Engineers and Contractors.